Installing SKG-certified frame parts for auxiliary boxes
- Insert the frame parts into the milled door frame.
- Fix the frame parts in the frame with the prescribed screws.
- Install the door, ensuring that the interval between the hook bolt and frame part is no greater than 1 mm.
This ensures that the hook bolt moves fully into the locking position and achieves the specified minimum dimension for engagement in the frame part. - Check that the hook bolt moves completely into the locking position and release position with ease.